Description
Davco K10 Plus is a premium performance, flexible, premixed, Class III, water based polyurethane waterproofing membrane designed for the use under tile, stone and other resilient finishes.
USES
Davco K10 Plus is suitable for interior and exterior applications. Commercial and domestic wall and floors including wet areas such as showers, bathrooms, terraces, balconies, roofs and walkways, prior to tiling, using a Sika branded polymer modified cement based tile adhesive. Davco K10 Plus is also suitable for confined areas as it is water based and solvent free.
CHARACTERISTICS AND ADVANTAGES
- Premixed, ready to use.
- Suitable as an anti fracture membrane
- Excellent cure time
- Water based polyurethane
- Class III, highly flexible >500%
- Non toxic
- Available in Green or Grey
Colour & Packaging
Green | 4L or 20L pail
Grey | 20L pail
Application
Drying Time
Allow the membrane to dry for approximately 1-2 hours prior to applying the second coat.
Allow the membrane to dry for 6-8 hours prior to tiling or other finishes.
*Measurements are taken at 22°C and 50% relative humidity. Specifications vary according to site conditions and should be taken as a guide only.
Consumption
The minimum dry film thickness required is 1.0mm.
This should be achieved by applying 2 coats at a rate of 1.45L/m2.
A 20L pail will cover approximately 13.8m2.
SUBSTRATE QUALITY
General
- All surfaces must be installed according to manufacturer’s instructions and relevant Australian Standards and be structurally sound, dry, clean and free from movement, oil, grease, wax, curing compounds, release agents, efflorescence or any other loose or contaminating material.
- Prior to application, remove all sharp protrusions, which may pierce the membrane
- Avoid voids, potholes and divots in the substrate must be appropriately prepared with a Sika branded patching mortar.
Concrete
- All new concrete slabs must have a wood float finish and be allowed to cure for 6 weeks.
- Old concrete must be cleaned with a strong commercial grade detergent or degreaser. Residue must be thoroughly washed off with clean water. Allow the surface to dry for at least 24 hours.
- If the concrete has a steel trowel or power float finish, it must be mechanically prepared to expose the aggregate. Signs of Laitance and Efflorescence must be removed.
Cement Render & Screeds
- Rendered or screeds must have a wood float finish and be allowed to cure for 7 days.
Light Weight Blocks
- Prime the surface with 2 coats of Davco Ultraprime or Davco PrimeX
Metal Surfaces
- All metal surfaces must be free from rust
- Prime metal surface Sika Prep n Prime
Bond Breaker
Suitable bond breaker sealant: Any Sika neutral cure silicone sealant
Refer to product datasheet for additional information.
Connector Sealants
Suitable connector sealant: Sikaflex Fillet or Sikaflex Construction AP
Refer to product datasheet for additional information
Crack / Joints – subject to movement
- All cracks / joints, irrespective of their width, must be filled with a Sika branded Neutral cure silicone sealant. Then a 50mm wide polyethylene / polypropylene tape should be placed over the crack, ensuring it adheres to the surface.
Building Boards and Sheeting
- Standard wall / floor building boards must be primed with a suitable Sika Branded primer and firmly fixed in accordance to manufacturer instructions and applicable Australian Standards. Such boards / sheeting include plasterboard, fibre cement sheeting, marine grade ply and wet area composition board. Check with the board / sheeting manufacturer for their suitability.
- Screw or nail heads must be treated with a Sika branded epoxy or a Sika connector sealant
- All sheeting joints need to be covered with a 50mm wide Polyethylene / Polypropylene tape.
Falls to Drains
- In all wet areas, it is important that falls be provided to the drain outlet. The slope of this fall should be 1:80 – which equates to 12.5mm fall over 1m. For wet areas, balconies, and rooftops, if the existing substrate does not provide the required falls, a sand/cement screed will be need to be created. Once the falls are in place and screeds have cured, apply the Davco K10 Plus as per instructions. Contact Sika Australia for more information on screed mix should this be required.
- For balconies and rooftops, the slope of this fall should be 1:100 – which equates to a 10mm fall over 1m. If the existing substrate does not provide the necessary fall, a sand / cement screed needs to be created. Once the screed is in place and has cured adequately, apply the membrane as per instructions below. Contact Sika Australia for more information on an appropriate screed mix should this be required.
SUBSTRATE PREPARATION
Substrate Priming
All substrates shall require priming prior to the application of Davco K10 Plus.
Substrate | Primer |
Porous substrates | Davco UltraPrime
Davco PrimeX Sikalastic Moisture Seal |
Dense Concrete | Davco PrimeX
Sika Prep n Prime Sikalastic Moisture Seal |
Early aged concrete and screeds | Sikalastic Moisture Seal |
Damp substates | Sikalastic Moisture Seal |
Metal and PVC terminations and connections | Sika Prep N Prime |
High Moisture content and substrates with negative hydrostatic pressure | Sikalastic Moisture Seal (min 2 coats) |
Refer to primer product datasheet for additional information.
CLEANING OF TOOLS
- Tools and excess K10 Plus can be cleaned up with water while it is still wet
Sika® Davco K10 Plus – Sika’s Website
Reviews
There are no reviews yet.