Flake Epoxy Flooring Package To Cover 80sqm
DIY Epoxy Flake Flooring Package
Discover the groundbreaking Epoxy Flake Packages available at Epoxy Warehouse, meticulously crafted to redefine the ease of DIY applications. Within this remarkable package, we present an all-inclusive kit featuring essential materials and fundamental accessories, tailored for the seamless application of two coats of epoxy flake flooring across expansive spaces of up to 80sqm.
For further information, please don't hesitate to contact us.
Areas of use
- Garage floors
- Warehouse floors
- Lunch rooms
- Patios and Balconies
- Building Entrances
- Manufacturing facilities
- Clean rooms
- Educational trade facilities
- Mechanical workshops
- Commercial kitchens
- Cafe Floors and more
Partial Flake Package
- 2x Ultrakote High Solids Epoxy full 16L kit
- 1x Box of Flake
- 2x Ultrakote UVSeal 8L Drums
Full Flake Package
- 2x Ultrakote High Solids Epoxy full 16L kit
- 6x Boxes of Flake
- 4x Ultrakote UVSeal 8L Drums
Epoxy Floor Coating Application Accessories Include:
- One Epoxy Application Twin Roller/Brush Kit — includes two rollers, two brushes, one tray, one heavy-duty frame, and two roller liners. (Extension pole not included — available from Bunnings or local hardware stores)
- One additional 270mm Epoxy Roller Cover
- One Pair of Spike Shoes — lets you walk on wet epoxy to fix missed spots and back-roll for better results
- One roll of Tesa 48mm cloth masking tape
- One pair of work gloves
Epoxy flooring products come in two parts. Part A should be mixed first, then poured into a measuring bucket. Add the appropriate amount of Part B and mix using a paddle attached to a cordless or corded drill (drill not included).
Steps to Achieve a Successful Seamless Flake System
- Prepare the substrate thoroughly by diamond grinding or acid etching — ensure the surface is free of dust, oil/grease, loose particles, paint, and moisture. If rising dampness is present, apply a moisture barrier primer first.
- Repair cracks and imperfections using two-pack epoxy fillers — use Sikadur 31 CFN for cracks, or the Epoxy Coving and Repair Kit for larger spalls. Allow minimum 6–8 hours to cure before grinding or coating.
- Apply first coat of epoxy and allow to cure — general curing time at 20°C is minimum 8 hours.
- Return within 24 hours to remove rubbish and imperfections — grind down high sections and patch low sections. If left beyond 30–36 hours, scratch with 80 grit sandpaper before recoating.
- Apply base coat and broadcast flake while wet — wear spike shoes and apply safety practices when walking over wet epoxy.
- Return the next day to vacuum loose flake and apply two clear top coats — curing time at 20°C is minimum 8 hours per coat. For floors subject to heavy chemical or fuel exposure, consider a two-pack clear top coat.
- Add anti-slip media to the topcoat for a higher slip rating — use a clear aluminium oxide to avoid visible colour in the clear coat.
- Floor is trafficable after minimum 24 hours. Allow minimum 5 days before parking cars, boats, trailers, or heavy objects.
Colour accuracy disclaimer: We have taken care to display the most accurate visuals of our products. However, we are not responsible for the colour accuracy of the device you are viewing our swatches on. These variations arise due to different computer monitors and devices (make, model and technology, as well as resolution, contrast and brightness control settings) in much the same way a scan will differ from an original image and a colour photocopy. Furthermore, coatings can exhibit variation in perceived colour depending on gloss level and application method. If you require a very specific colour match, please make your selection via actual swatches and colour boards available at our showroom.
Product Disclaimer: Ensure you read all product, technical and safety data sheets prior to application as liability falls on the applicator. All products must be applied in accordance with manufacturer’s recommended method.

