Flowcrete Flowcoat OP 8 x 10kg Pretinted Epoxy Floor Coating Package – 200m²
Flowcrete Flowcoat OP is a high-performance epoxy floor coating system designed to create a durable, seamless floor with a uniform Orange Peel surface texture. This package includes 8 x 10kg Flowcoat OP kits and is suitable for industrial, commercial and other high-use areas.
The Flowcoat OP 0.3mm system is applied in two coats at 0.2kg/m² per coat, providing coverage of up to approximately 200m² from eight 10kg kits. Actual coverage can vary depending on surface condition, preparation, application method and material wastage.
Flowcoat OP Orange Peel Finish
Flowcoat OP creates a uniform Orange Peel surface texture with a gloss finish. The textured epoxy coating provides a practical, hard-wearing floor surface while maintaining a clean and uniform appearance.
The seamless finish is low maintenance and resistant to abrasion and chemicals, making Flowcoat OP suitable for areas subject to regular traffic and general industrial use.
What's Included
- 8 x 10kg Flowcoat OP epoxy coating kits
- 80kg total Flowcoat OP
- Two-coat 0.3mm system
- Gloss Orange Peel textured finish
- Coverage up to approximately 200m² at the specified application rate
Flowcoat OP Coverage
The manufacturer's standard 0.3mm Smooth Finish system specifies Flowcoat OP at 0.2kg/m² for the first coat and 0.2kg/m² for the second coat.
- First coat: 0.2kg/m²
- Second coat: 0.2kg/m²
- Total application rate: 0.4kg/m²
- 8 x 10kg kits: 80kg total
- Calculated coverage: up to approximately 200m²
**Actual coverage may vary depending on concrete porosity, surface profile, preparation, application technique and material wastage. Porous or uneven surfaces may require additional preparation or primer.**
Flowcoat OP Applications
- Industrial floors
- Commercial flooring areas
- Workshops and service areas
- Warehouses and general industrial facilities
- High-use concrete floors
- Hard-wearing protective floor coatings
Why Choose Flowcoat OP?
- Uniform Orange Peel textured surface
- Durable and hard-wearing epoxy coating
- Seamless, hygienic and low-maintenance finish
- Good chemical and abrasion resistance
- Gloss finish available in a range of colours
- Suitable for industrial and commercial environments
Flowcoat OP Application Instructions
Step 1: Surface Preparation
- Concrete should be finished by steel trowel.
- Complete surface preparation using totally enclosed light shot blasting or diamond grinding to a minimum CSP2 before applying any coating.
- Light shot blasting may leave track and blast lines which will not be covered.
- Remove all cementitious laitance to expose a sound, dry, dust-free and open-textured surface.
- Prepare hard-to-reach areas and areas around the perimeter using hand-held preparation equipment.
- For proper surface preparation methods, refer to ICRI’s Technical Guideline No. 03732.
Step 2: Apply Flowprime AU **Required for Porous Surfaces only
The substrate must be surface dry before applying Flowprime AU.
- Stir Base A to re-disperse any settlement.
- Decant the required amount of Base A into a clean container by weight using digital scales.
- Add the required amount of Hardener B to the decanted Base A container and drain thoroughly.
- Mix with a slow-speed drill and helical spinner head for 1 minute, taking care not to entrain air.
- Add 2–7% Xylene if required depending on conditions and mix for a further 30 seconds.
- Immediately after mixing, apply Flowprime AU by squeegee and/or roller.
Step 3: Mix Flowcoat OP – First Coat
- The substrate must be surface dry before applying Flowcoat OP.
- If Flowprime AU has been applied, Flowcoat OP must be applied within 24 hours at 20°C following application of Flowprime AU.
- Flowcoat OP pack components are pre-weighed for optimum performance. Do not split or proportion packs unless required; if packs are proportioned, this must be completed by weight using digital scales.
- Stir Base A to re-disperse any settlement.
- Add Hardener B to the Base A container and drain thoroughly.
- Mix with a slow-speed drill and helical spinner head for 90 seconds, taking care not to entrain air.
- Add 2–7% Xylene if required depending on conditions and mix for a further 30 seconds.
- Immediately after mixing, apply Flowcoat OP by squeegee and/or roller.
- Allow to cure.
Step 4: Mix Flowcoat OP – Second Coat
- The previous coat must be surface dry before applying the second coat of Flowcoat OP.
- The second coat must be applied within 24 hours at 20°C following application of the first coat.
- Flowcoat OP pack components are pre-weighed for optimum performance. Do not split or proportion packs unless required; if packs are proportioned, this must be completed by weight using digital scales.
- Stir Base A to re-disperse any settlement.
- Add Pigment if supplied separately and mix until uniform.
- Add Hardener B to the Base A container and drain thoroughly.
- Mix with a slow-speed drill and helical spinner head for 90 seconds, taking care not to entrain air.
- Add 2–7% Xylene if required depending on conditions and mix for a further 30 seconds.
- Immediately after mixing, apply the second coat of Flowcoat OP by roller.
- Allow to cure.
Step 5: Cleaning
- Tools and equipment can be cleaned with MEK, Acetone or Xylene.
Step 6: Allow for Traffic
- Allow to cure for a minimum of 24 hours at temperatures no less than 20°C before foot traffic.
- Allow a minimum of 72 hours before vehicular traffic.
Flowcoat OP Application Conditions
- Recommended material and substrate temperature: 5–35°C
- Substrate temperature must be at least 3°C above dew point
- Temperatures should not fall below 5°C for 24 hours after application
- Concrete moisture should be below 75% RH
- Concrete or screed should have a minimum strength of 25 N/mm²
- Ensure adequate safety ventilation during application
Flowcoat OP Curing Times
| Temp. | Foot Traffic | Vehicle Traffic | Full Chemical Cure |
|---|---|---|---|
| 10°C | 48 hours | 96 hours | 12 days |
| 20°C | 24 hours | 72 hours | 7 days |
| 30°C | 18 hours | 48 hours | 6 days |
These figures are typical properties achieved in laboratory tests at 20°C and 50% relative humidity. At 20°C, allow a minimum of 24 hours before foot traffic and 72 hours before vehicular traffic.
Recommended Equipment
- 10–12mm nap roller
- Slow-speed drill with helical mixer head
- Squeegee
- Spike shoes where required for the specified system
- Digital scales if packs need to be proportioned
Flowcoat OP Supply Australia-Wide
Epoxy Warehouse supplies Flowcrete Flowcoat OP for industrial, commercial and other epoxy flooring projects across Australia. Immediate pickup is available from our Sydney locations at Rydalmere and Silverwater, with Australia-wide delivery available.
This package includes 8x 10kg Flowcoat OP kits providing up to approximately 200m² based on the manufacturer's specified application rate for the 0.3mm two-coat system.
For larger projects requiring additional Flowcoat OP kits, contact Epoxy Warehouse for pricing and availability.
How to Apply Flowcoat OP Epoxy Floor Coating:
Application Guide
Prepare Surface
Ensure concrete is sound, dry, clean and mechanically prepared before application.
Repair & Check
Repair cracks and surface defects, then check moisture levels before application.
Mix & Apply
Mix the components thoroughly, then apply the epoxy at the specified coverage rate.
Finish & Cure
Allow the coating to cure fully before foot traffic, vehicle traffic or chemical exposure.