{"product_id":"epirez-highway-patch-rapid-set-cement-15kg","title":"Epirez Highway Patch Rapid Set Cement Patching Mortar 15kg","description":"\u003cp\u003e\u003cstrong\u003eEPIREZ® Highway Patch\u003c\/strong\u003e is a quick-setting hydraulic cement patching mortar designed for fast concrete repairs. It provides high early strength, high bond strength and precision non-shrink performance for repair work where rapid return to service is important.\u003c\/p\u003e\n\u003cp\u003eHighway Patch is designed for concrete repairs in transportation, commercial and industrial environments. It can be trowelled or poured into the repair area and finished by brooming, brushing or trowelling.\u003c\/p\u003e\n\u003cp\u003eThe material can also be extended with up to \u003cstrong\u003e60% pea gravel measuring 6–10 mm\u003c\/strong\u003e. This provides an economical way to increase the volume of the repair material without the excessive voids, reduced workability or long-term durability deterioration described for other extended patching materials.\u003c\/p\u003e\n\u003ch3\u003eKey Features and Benefits\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eQuick-setting repair mortar:\u003c\/strong\u003e Designed for fast concrete repair applications.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRapid strength gain:\u003c\/strong\u003e Develops high early compressive strength.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNon-shrink performance:\u003c\/strong\u003e Provides 0.0% shrinkage according to ASTM C-827.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHigh bond strength:\u003c\/strong\u003e Bond strength reaches 27.6 MPa at 7 days.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHigh chemical resistance:\u003c\/strong\u003e Resists oil, grease, gasoline, salts and other listed chemicals.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUp to 60% extension:\u003c\/strong\u003e Can be extended with 6–10 mm pea gravel.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eWet\/dry resistance:\u003c\/strong\u003e Provides resistance to wet\/dry conditions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFreeze\/thaw resistance:\u003c\/strong\u003e Provides resistance for demanding patching environments.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlexible finishing:\u003c\/strong\u003e Can be broomed, brushed or trowelled after levelling.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eWhere Can EPIREZ® Highway Patch Be Used?\u003c\/h3\u003e\n\u003cp\u003eHighway Patch is designed for a range of fast concrete repair applications, including:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eHighways\u003c\/li\u003e\n\u003cli\u003eBridges\u003c\/li\u003e\n\u003cli\u003eSidewalks\u003c\/li\u003e\n\u003cli\u003eAirport runways\u003c\/li\u003e\n\u003cli\u003eRamps\u003c\/li\u003e\n\u003cli\u003eFast concrete repairs\u003c\/li\u003e\n\u003cli\u003eFootpaths\u003c\/li\u003e\n\u003cli\u003eFactory floors\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eCoverage and Kit Size\u003c\/h3\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003ePack Size\u003c\/th\u003e\n\u003cth\u003eVolume\u003c\/th\u003e\n\u003cth\u003eEstimated Coverage\u003c\/th\u003e\n\u003cth\u003eApplication Thickness\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003e15 kg\u003c\/td\u003e\n\u003ctd\u003e8.0 L\u003c\/td\u003e\n\u003ctd\u003e0.6 m²\u003c\/td\u003e\n\u003ctd\u003e12.5 mm\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003cp\u003eThe 15 kg EPIREZ® Highway Patch pack provides approximately \u003cstrong\u003e0.6 m² at 12.5 mm thick\u003c\/strong\u003e.\u003c\/p\u003e\n\u003ch3\u003eExtending Highway Patch with Pea Gravel\u003c\/h3\u003e\n\u003cp\u003eEPIREZ® Highway Patch can be extended with up to \u003cstrong\u003e60% pea gravel\u003c\/strong\u003e measuring 6–10 mm.\u003c\/p\u003e\n\u003cp\u003eThe extension is designed to provide an economical way to increase the repair volume without creating excessive voids or reducing workability and long-term durability as described in the product information.\u003c\/p\u003e\n\u003ch3\u003eSurface Preparation\u003c\/h3\u003e\n\u003cp\u003eExisting concrete should be thoroughly prepared before applying Highway Patch.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eRemove oil and other deleterious substances.\u003c\/li\u003e\n\u003cli\u003eRemove all unsound or damaged concrete until sound, clean concrete is exposed.\u003c\/li\u003e\n\u003cli\u003eRemove loose material by wire brushing, washing and\/or an oil-free jet.\u003c\/li\u003e\n\u003cli\u003eThoroughly saturate the concrete with water two hours before application.\u003c\/li\u003e\n\u003cli\u003eRemove standing water immediately before patching.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eMixing Instructions\u003c\/h3\u003e\n\u003cp\u003eMixing and placement temperatures must be above \u003cstrong\u003e5°C\u003c\/strong\u003e.\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003eUse a mortar mixer or suitable mixing paddle with a low-speed 400–1000 rpm power mixer.\u003c\/li\u003e\n\u003cli\u003eWet down the mixer and drain excess water.\u003c\/li\u003e\n\u003cli\u003eWith the mixer running, add the minimum recommended water.\u003c\/li\u003e\n\u003cli\u003eAdd EPIREZ® Highway Patch.\u003c\/li\u003e\n\u003cli\u003eMix for 2–5 minutes.\u003c\/li\u003e\n\u003cli\u003eAdd more water only if required, without exceeding the maximum specified amount.\u003c\/li\u003e\n\u003cli\u003eMix only the amount that can be placed within 10 minutes.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003cp\u003eThe water requirement is \u003cstrong\u003e1.5–2.0 L per 15 kg pail\u003c\/strong\u003e.\u003c\/p\u003e\n\u003ch3\u003eApplication\u003c\/h3\u003e\n\u003cp\u003eEPIREZ® Highway Patch can be \u003cstrong\u003etrowelled or poured\u003c\/strong\u003e into the prepared repair area.\u003c\/p\u003e\n\u003cp\u003eAfter levelling, the surface can be finished by:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eBrooming\u003c\/li\u003e\n\u003cli\u003eBrushing\u003c\/li\u003e\n\u003cli\u003eTrowelling\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eDo not place Highway Patch in layers and do not feather edge the material.\u003c\/p\u003e\n\u003ch3\u003eCold Weather Application\u003c\/h3\u003e\n\u003cp\u003eWhen using Highway Patch at or near freezing temperatures, store the material in the warmest practical location.\u003c\/p\u003e\n\u003cp\u003eThe patched area must remain above \u003cstrong\u003e5°C\u003c\/strong\u003e until Highway Patch has set.\u003c\/p\u003e\n\u003ch3\u003eCuring\u003c\/h3\u003e\n\u003cp\u003eAs soon as the patch has hardened, flood the surface with sufficient water to keep it wet for at least \u003cstrong\u003e30 minutes\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cp\u003eIf the patch will not be top-coated, use a concrete curing compound as part of the curing process.\u003c\/p\u003e\n\u003ch3\u003eStrength Development\u003c\/h3\u003e\n\u003cp\u003eEPIREZ® Highway Patch develops high early compressive strength, making it suitable for repair applications where early strength development is important.\u003c\/p\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003eAge\u003c\/th\u003e\n\u003cth\u003eCompressive Strength\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003e1 hour\u003c\/td\u003e\n\u003ctd\u003e20.7 MPa\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e3 hours\u003c\/td\u003e\n\u003ctd\u003e34.4 MPa\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e1 day\u003c\/td\u003e\n\u003ctd\u003e48.3 MPa\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e7 days\u003c\/td\u003e\n\u003ctd\u003e58.6 MPa\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003ch3\u003eBond Strength and Non-Shrink Performance\u003c\/h3\u003e\n\u003cp\u003eHighway Patch has a stated bond strength of \u003cstrong\u003e17.2 MPa at 1 day\u003c\/strong\u003e and \u003cstrong\u003e27.6 MPa at 7 days\u003c\/strong\u003e according to ASTM C-882.\u003c\/p\u003e\n\u003cp\u003eIts volume change is stated as \u003cstrong\u003e0.0% shrinkage\u003c\/strong\u003e according to ASTM C-827.\u003c\/p\u003e\n\u003ch3\u003eImportant Product Limitations\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eDo not mix or place Highway Patch below \u003cstrong\u003e5°C\u003c\/strong\u003e.\u003c\/li\u003e\n\u003cli\u003eThe patched area must remain above 5°C until the material has set.\u003c\/li\u003e\n\u003cli\u003eDo not mix more material than can be placed within 10 minutes.\u003c\/li\u003e\n\u003cli\u003eDo not exceed the maximum specified water addition.\u003c\/li\u003e\n\u003cli\u003eDo not place the material in layers.\u003c\/li\u003e\n\u003cli\u003eDo not feather edge Highway Patch.\u003c\/li\u003e\n\u003cli\u003eProtect the patch from freezing during setting.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eStorage and Shelf Life\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eStore in dry conditions between \u003cstrong\u003e10°C and 30°C\u003c\/strong\u003e.\u003c\/li\u003e\n\u003cli\u003eProtect from frost.\u003c\/li\u003e\n\u003cli\u003eMinimum shelf life is \u003cstrong\u003e12 months\u003c\/strong\u003e when stored in original sealed containers in dry conditions.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eTechnical Specifications\u003c\/h3\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003eSpecification\u003c\/th\u003e\n\u003cth\u003eTechnical Data\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eProduct\u003c\/td\u003e\n\u003ctd\u003eEPIREZ® Highway Patch\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eProduct Type\u003c\/td\u003e\n\u003ctd\u003eQuick-setting hydraulic cement patching mortar\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003ePack Size\u003c\/td\u003e\n\u003ctd\u003e15 kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eVolume\u003c\/td\u003e\n\u003ctd\u003e8.0 L\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eWork Time @ 25°C\u003c\/td\u003e\n\u003ctd\u003e10 minutes\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eInitial Set @ 25°C\u003c\/td\u003e\n\u003ctd\u003e3 hours (fluid)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eFinal Set @ 25°C\u003c\/td\u003e\n\u003ctd\u003e5 hours (fluid)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eWater Requirement\u003c\/td\u003e\n\u003ctd\u003e1.5–2.0 L per 15 kg pail\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eVolume Change\u003c\/td\u003e\n\u003ctd\u003e0.0% shrinkage according to ASTM C-827\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eBond Strength @ 1 Day\u003c\/td\u003e\n\u003ctd\u003e17.2 MPa according to ASTM C-882\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eBond Strength @ 7 Days\u003c\/td\u003e\n\u003ctd\u003e27.6 MPa according to ASTM C-882\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eCompressive Strength @ 1 Hour\u003c\/td\u003e\n\u003ctd\u003e20.7 MPa\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eCompressive Strength @ 3 Hours\u003c\/td\u003e\n\u003ctd\u003e34.4 MPa\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eCompressive Strength @ 1 Day\u003c\/td\u003e\n\u003ctd\u003e48.3 MPa\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eCompressive Strength @ 7 Days\u003c\/td\u003e\n\u003ctd\u003e58.6 MPa\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eEstimated Coverage\u003c\/td\u003e\n\u003ctd\u003e0.6 m² at 12.5 mm thick per 15 kg pack\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMaximum Pea Gravel Extension\u003c\/td\u003e\n\u003ctd\u003eUp to 60% using 6–10 mm pea gravel\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMinimum Application Temperature\u003c\/td\u003e\n\u003ctd\u003e5°C\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eShelf Life\u003c\/td\u003e\n\u003ctd\u003e12 months when stored in original sealed containers in dry conditions\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003cp\u003e\u003cstrong\u003eImportant:\u003c\/strong\u003e Always read the current manufacturer's Technical Data Sheet before mixing, surface preparation or application.\u003c\/p\u003e","brand":"Epirez","offers":[{"title":"Default Title","offer_id":45551494266966,"sku":"E991605","price":127.85,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0694\/4836\/8214\/files\/EpirezHighwayPatchRapidSetCement15kg.jpg?v=1786506318","url":"https:\/\/epoxywarehouse.com.au\/products\/epirez-highway-patch-rapid-set-cement-15kg","provider":"Epoxy Warehouse | Epoxy Floor Coating Supplier","version":"1.0","type":"link"}