{"product_id":"100m-two-coat-epoxy-floor-coating-package-4x10kg-flowcrete-flowcoat-op","title":"100SQM Two Coats Flowcoat OP Epoxy Floor Coating Package","description":"\u003ch2 style=\"text-align: center;\"\u003e\u003cspan style=\"color: rgb(169, 4, 4);\"\u003eFlowcrete Flowcoat OP 4 x 10kg Epoxy Floor Coating Package – 100m²\u003c\/span\u003e\u003c\/h2\u003e\n\u003chr\u003e\n\u003cp\u003eFlowcrete Flowcoat OP is a high-performance epoxy floor coating system designed to create a durable, seamless floor with a uniform Orange Peel surface texture. This package includes 4 x 10kg Flowcoat OP kits and is suitable for industrial, commercial and other high-use areas.\u003c\/p\u003e\n\u003cp\u003eThe Flowcoat OP 0.3mm system is applied in two coats at 0.2kg\/m² per coat, providing coverage of up to approximately 100m² from four 10kg kits. Actual coverage can vary depending on surface condition, preparation, application method and material wastage.\u003c\/p\u003e\n\u003ch3\u003e\u003cspan style=\"background-color: rgb(167, 6, 6); color: rgb(255, 255, 255);\"\u003eFlowcoat OP Orange Peel Finish\u003c\/span\u003e\u003c\/h3\u003e\n\u003cp\u003eFlowcoat OP creates a uniform Orange Peel surface texture with a gloss finish. The textured epoxy coating provides a practical, hard-wearing floor surface while maintaining a clean and uniform appearance.\u003c\/p\u003e\n\u003cp\u003eThe seamless finish is low maintenance and resistant to abrasion and chemicals, making Flowcoat OP suitable for areas subject to regular traffic and general industrial use.\u003c\/p\u003e\n\u003ch3\u003e\u003cspan style=\"background-color: rgb(171, 7, 7); color: rgb(255, 255, 255);\"\u003eWhat's Included\u003c\/span\u003e\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e4 x 10kg Flowcoat OP epoxy coating kits\u003c\/li\u003e\n\u003cli\u003e40kg total Flowcoat OP\u003c\/li\u003e\n\u003cli\u003eTwo-coat 0.3mm system\u003c\/li\u003e\n\u003cli\u003eGloss Orange Peel textured finish\u003c\/li\u003e\n\u003cli\u003eCoverage up to approximately 100m² at the specified application rate\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003e\u003cspan style=\"background-color: rgb(173, 5, 5); color: rgb(255, 255, 255);\"\u003eFlowcoat OP Coverage\u003c\/span\u003e\u003c\/h3\u003e\n\u003cp\u003eThe manufacturer's standard 0.3mm Smooth Finish system specifies Flowcoat OP at 0.2kg\/m² for the first coat and 0.2kg\/m² for the second coat.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFirst coat: 0.2kg\/m²\u003c\/li\u003e\n\u003cli\u003eSecond coat: 0.2kg\/m²\u003c\/li\u003e\n\u003cli\u003eTotal application rate: 0.4kg\/m²\u003c\/li\u003e\n\u003cli\u003e4 x 10kg kits: 40kg total\u003c\/li\u003e\n\u003cli\u003eCalculated coverage: up to approximately 100m²\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cem\u003e**Actual coverage may vary depending on concrete porosity, surface profile, preparation, application technique and material wastage. Porous or uneven surfaces may require additional preparation or primer.**\u003c\/em\u003e\u003c\/p\u003e\n\u003ch3\u003e\u003cspan style=\"color: rgb(255, 255, 255); background-color: rgb(176, 7, 7);\"\u003eFlowcoat OP Applications\u003c\/span\u003e\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eIndustrial floors\u003c\/li\u003e\n\u003cli\u003eCommercial flooring areas\u003c\/li\u003e\n\u003cli\u003eWorkshops and service areas\u003c\/li\u003e\n\u003cli\u003eWarehouses and general industrial facilities\u003c\/li\u003e\n\u003cli\u003eHigh-use concrete floors\u003c\/li\u003e\n\u003cli\u003eHard-wearing protective floor coatings\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003e\u003cspan style=\"background-color: rgb(174, 4, 4); color: rgb(255, 255, 255);\"\u003eWhy Choose Flowcoat OP?\u003c\/span\u003e\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eUniform Orange Peel textured surface\u003c\/li\u003e\n\u003cli\u003eDurable and hard-wearing epoxy coating\u003c\/li\u003e\n\u003cli\u003eSeamless, hygienic and low-maintenance finish\u003c\/li\u003e\n\u003cli\u003eGood chemical and abrasion resistance\u003c\/li\u003e\n\u003cli\u003eGloss finish available in a range of colours\u003c\/li\u003e\n\u003cli\u003eSuitable for industrial and commercial environments\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003e\u003cspan style=\"background-color: rgb(173, 5, 5); color: rgb(255, 255, 255);\"\u003eFlowcoat OP Application Instructions\u003c\/span\u003e\u003c\/h3\u003e\n\u003cp\u003e\u003cspan style=\"color: rgb(0, 0, 0);\"\u003e\u003cstrong\u003eStep 1: Surface Preparation\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eConcrete should be finished by steel trowel.\u003c\/li\u003e\n\u003cli\u003eComplete surface preparation using totally enclosed light shot blasting or diamond grinding to a minimum CSP2 before applying any coating.\u003c\/li\u003e\n\u003cli\u003eLight shot blasting may leave track and blast lines which will not be covered.\u003c\/li\u003e\n\u003cli\u003eRemove all cementitious laitance to expose a sound, dry, dust-free and open-textured surface.\u003c\/li\u003e\n\u003cli\u003ePrepare hard-to-reach areas and areas around the perimeter using hand-held preparation equipment.\u003c\/li\u003e\n\u003cli\u003eFor proper surface preparation methods, refer to ICRI’s Technical Guideline No. 03732.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003e\u003cspan style=\"color: rgb(0, 0, 0);\"\u003eStep 2: Apply Flowprime AU \u003c\/span\u003e **\u003c\/strong\u003e\u003cem\u003eRequired for Porous Surfaces only\u003c\/em\u003e\u003c\/p\u003e\n\u003cp\u003eThe substrate must be surface dry before applying Flowprime AU.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eStir Base A to re-disperse any settlement.\u003c\/li\u003e\n\u003cli\u003eDecant the required amount of Base A into a clean container by weight using digital scales.\u003c\/li\u003e\n\u003cli\u003eAdd the required amount of Hardener B to the decanted Base A container and drain thoroughly.\u003c\/li\u003e\n\u003cli\u003eMix with a slow-speed drill and helical spinner head for 1 minute, taking care not to entrain air.\u003c\/li\u003e\n\u003cli\u003eAdd 2–7% Xylene if required depending on conditions and mix for a further 30 seconds.\u003c\/li\u003e\n\u003cli\u003eImmediately after mixing, apply Flowprime AU by squeegee and\/or roller.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cspan style=\"color: rgb(0, 0, 0);\"\u003e\u003cstrong\u003eStep 3: Mix Flowcoat OP – First Coat\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eThe substrate must be surface dry before applying Flowcoat OP.\u003c\/li\u003e\n\u003cli\u003eIf Flowprime AU has been applied, Flowcoat OP must be applied within 24 hours at 20°C following application of Flowprime AU.\u003c\/li\u003e\n\u003cli\u003eFlowcoat OP pack components are pre-weighed for optimum performance. Do not split or proportion packs unless required; if packs are proportioned, this must be completed by weight using digital scales.\u003c\/li\u003e\n\u003cli\u003eStir Base A to re-disperse any settlement.\u003c\/li\u003e\n\u003cli\u003eAdd Hardener B to the Base A container and drain thoroughly.\u003c\/li\u003e\n\u003cli\u003eMix with a slow-speed drill and helical spinner head for 90 seconds, taking care not to entrain air.\u003c\/li\u003e\n\u003cli\u003eAdd 2–7% Xylene if required depending on conditions and mix for a further 30 seconds.\u003c\/li\u003e\n\u003cli\u003eImmediately after mixing, apply Flowcoat OP by squeegee and\/or roller.\u003c\/li\u003e\n\u003cli\u003eAllow to cure.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cspan style=\"color: rgb(0, 0, 0);\"\u003e\u003cstrong\u003eStep 4: Mix Flowcoat OP – Second Coat\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eThe previous coat must be surface dry before applying the second coat of Flowcoat OP.\u003c\/li\u003e\n\u003cli\u003eThe second coat must be applied within 24 hours at 20°C following application of the first coat.\u003c\/li\u003e\n\u003cli\u003eFlowcoat OP pack components are pre-weighed for optimum performance. Do not split or proportion packs unless required; if packs are proportioned, this must be completed by weight using digital scales.\u003c\/li\u003e\n\u003cli\u003eStir Base A to re-disperse any settlement.\u003c\/li\u003e\n\u003cli\u003eAdd Pigment if supplied separately and mix until uniform.\u003c\/li\u003e\n\u003cli\u003eAdd Hardener B to the Base A container and drain thoroughly.\u003c\/li\u003e\n\u003cli\u003eMix with a slow-speed drill and helical spinner head for 90 seconds, taking care not to entrain air.\u003c\/li\u003e\n\u003cli\u003eAdd 2–7% Xylene if required depending on conditions and mix for a further 30 seconds.\u003c\/li\u003e\n\u003cli\u003eImmediately after mixing, apply the second coat of Flowcoat OP by roller.\u003c\/li\u003e\n\u003cli\u003eAllow to cure.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cspan style=\"color: rgb(0, 0, 0);\"\u003e\u003cstrong\u003eStep 5: Cleaning\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eTools and equipment can be cleaned with MEK, Acetone or Xylene.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cspan style=\"color: rgb(0, 0, 0);\"\u003e\u003cstrong\u003eStep 6: Allow for Traffic\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eAllow to cure for a minimum of 24 hours at temperatures no less than 20°C before foot traffic.\u003c\/li\u003e\n\u003cli\u003eAllow a minimum of 72 hours before vehicular traffic.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003e\u003cspan style=\"background-color: rgb(174, 9, 9); color: rgb(255, 255, 255);\"\u003eFlowcoat OP Application Conditions\u003c\/span\u003e\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eRecommended material and substrate temperature: 5–35°C\u003c\/li\u003e\n\u003cli\u003eSubstrate temperature must be at least 3°C above dew point\u003c\/li\u003e\n\u003cli\u003eTemperatures should not fall below 5°C for 24 hours after application\u003c\/li\u003e\n\u003cli\u003eConcrete moisture should be below 75% RH\u003c\/li\u003e\n\u003cli\u003eConcrete or screed should have a minimum strength of 25 N\/mm²\u003c\/li\u003e\n\u003cli\u003eEnsure adequate safety ventilation during application\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003e\u003cspan style=\"background-color: rgb(179, 5, 5); color: rgb(255, 255, 255);\"\u003eFlowcoat OP Curing Times\u003c\/span\u003e\u003c\/h3\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003eTemp.\u003c\/th\u003e\n\u003cth\u003eFoot Traffic\u003c\/th\u003e\n\u003cth\u003eVehicle Traffic\u003c\/th\u003e\n\u003cth\u003eFull Chemical Cure\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003e10°C\u003c\/td\u003e\n\u003ctd\u003e48 hours\u003c\/td\u003e\n\u003ctd\u003e96 hours\u003c\/td\u003e\n\u003ctd\u003e12 days\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e20°C\u003c\/td\u003e\n\u003ctd\u003e24 hours\u003c\/td\u003e\n\u003ctd\u003e72 hours\u003c\/td\u003e\n\u003ctd\u003e7 days\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e30°C\u003c\/td\u003e\n\u003ctd\u003e18 hours\u003c\/td\u003e\n\u003ctd\u003e48 hours\u003c\/td\u003e\n\u003ctd\u003e6 days\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003cp\u003eThese figures are typical properties achieved in laboratory tests at 20°C and 50% relative humidity. At 20°C, allow a minimum of 24 hours before foot traffic and 72 hours before vehicular traffic.\u003c\/p\u003e\n\u003ch3\u003e\u003cspan style=\"background-color: rgb(173, 5, 5); color: rgb(255, 255, 255);\"\u003eRecommended Equipment\u003c\/span\u003e\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e10–12mm nap roller\u003c\/li\u003e\n\u003cli\u003eSlow-speed drill with helical mixer head\u003c\/li\u003e\n\u003cli\u003eSqueegee\u003c\/li\u003e\n\u003cli\u003eSpike shoes where required for the specified system\u003c\/li\u003e\n\u003cli\u003eDigital scales if packs need to be proportioned\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003e\u003cspan style=\"background-color: rgb(171, 3, 3); color: rgb(255, 255, 255);\"\u003eFlowcoat OP Supply Australia-Wide\u003c\/span\u003e\u003c\/h3\u003e\n\u003cp\u003eEpoxy Warehouse supplies Flowcrete Flowcoat OP for industrial, commercial and other epoxy flooring projects across Australia. Immediate pickup is available from our Sydney locations at \u003cstrong\u003eRydalmere and Silverwater\u003c\/strong\u003e, with Australia-wide delivery available.\u003c\/p\u003e\n\u003cp\u003eThis package includes 4 x 10kg Flowcoat OP kits providing up to approximately 100m² based on the manufacturer's specified application rate for the 0.3mm two-coat system.\u003c\/p\u003e\n\u003cp\u003eFor larger projects requiring additional Flowcoat OP kits, contact Epoxy Warehouse for pricing and availability.\u003c\/p\u003e\n\u003ch4\u003e\u003cspan style=\"background-color: rgb(183, 6, 6); color: rgb(255, 255, 255);\"\u003eHow to Apply Flowcoat OP Epoxy Floor Coating:\u003c\/span\u003e\u003c\/h4\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003ciframe width=\"1200\" height=\"500\" src=\"https:\/\/www.youtube.com\/embed\/kqucZ8BkYo0\" title=\"Flowcrete Epoxy Flooring - Tremco Training - How to Apply Epoxy Resin Roll Coat\"\u003e\u003c\/iframe\u003e\u003c\/p\u003e","brand":"Flowcrete","offers":[{"title":"N44 Bridge Grey","offer_id":45756340174934,"sku":null,"price":1100.0,"currency_code":"AUD","in_stock":true},{"title":"Light Grey","offer_id":45756340207702,"sku":null,"price":1100.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0694\/4836\/8214\/files\/Flowcrete_flowcoat_op_10kg_kit.jpg?v=1787185609","url":"https:\/\/epoxywarehouse.com.au\/products\/100m-two-coat-epoxy-floor-coating-package-4x10kg-flowcrete-flowcoat-op","provider":"Epoxy Warehouse | Epoxy Floor Coating Supplier","version":"1.0","type":"link"}